318 — Direktlink
16.05.2009, 21:16 Uhr
Emiel
|
Some new pics from last 2 weeks.
First of concrete beams with LTM 1500 and AC 650 (HERCULES)

LG 1750 KR Wind lifting a 220t offshore footprint

Lifting 245t bridge deck with LTM 1400-7.1 and AC 650 (BRUTUS)

New AC 500-2 Mammoet

MAN with a 245t bridge on 2x 9axle Scheuerle

Lifting the 245 bridge deck again with LTM 1400-7.1, AC 500-2 and BRUTUS

New LTM 1400-7.1 and AC 700 (BEAST) lifting 145t construction

AC 500-1 and HERCULES lifting a 200t boiler

AC 500-2 and new LTM 1250-6.1 lifting 100t columns, same quay, same day as picture above.

LTM 1250-6.1, AC 500-2 and BEAST all working with max counterweight and superlift lifting the 100t columns

KMK 8400 lifting some concrete segments

AC 500-2 and BEAST lifting 200t shipsection

LG 1750 with HERCULES and Peinemann, lifting 270t column

LG 1750 itself with the column

A picture from the archives, taken october last year. Seafox 7, HERCULES and Nederhoff lifting same column as above.
 -- www.emielschoonen.nl updated: 30/07/13 |